About
The University of Washington’s School of Dentistry, located in the B-Wing of the Magnuson Health Sciences Center, recently completed a 2,600 sq. ft. renovation, featuring the installation of four new dental simulation desks for dental students. This tenant improvement project was completed in Q1 2025.
Teknon collaborated closely with the general contractor and University of Washington staff to ensure the project was executed smoothly with minimal disruption to hospital operations. The scope of work included installing a new electrical panel, removing and reinstalling existing light fixtures, and providing power to the new simulation desks, enhancing the learning experience for dental students.
Key Benefits:
- Installed a new panel to meet the electrical needs of the School of Dentistry.
- Final connections to the ADEC modular furniture.
- Assistance in identifying scope between General contractor team and owner’s direct contractors.
Coordination with UW Facilities teams to coordinate electrical shutdowns for new installations in existing equipment.
